Grand Opening

From Kwartzlab
(Difference between revisions)
Jump to: navigation, search
(Wednesday Sept 30)
(Time Line)
 
(12 intermediate revisions by one user not shown)
Line 2: Line 2:
  
 
= Time Line =  
 
= Time Line =  
== Wednesday Sept 23 - Friday Sept 25 ==
+
 
* Thursday: Prime the Lounge (Michael)
+
== Not Scheduled Yet ==
* Friday: Paint the Lounge (Michael)
+
* paint door & towel rack with glossy black enamel (Ben)
* take fridge to curb Thursday evening (for Friday morning garbage pickup)
+
* install lattice in work room (Mark & Caelyn)
 +
* purchase liquor
 +
* arrange catering (Natalie, Cedric)
 +
 
 +
 
 +
== Thursday Sept 24 ==
 +
* Sand & prime the Lounge (Michael)
 +
* take fridge to curb  
 +
* take any other garbage or recycling to curb
 
* posters need to be put up all around town
 
* posters need to be put up all around town
  
== Saturday Sept 26 ==
+
== Friday Sept 25 ==
 +
* Paint the Lounge -- 2 coats (Michael)
 +
* posters need to be put up all around town
  
 +
== Saturday Sept 26 ==
 
* Two Hands Project visits
 
* Two Hands Project visits
 
* tiling the kitchen (Gus, Cheryl?)
 
* tiling the kitchen (Gus, Cheryl?)
 +
* replace glass window panes (Gus)
 
* paint window frames (Steph)
 
* paint window frames (Steph)
* install lattice in work room (Mark & Caelyn)
 
 
* *if painting is done* arrange furniture/shelving in lounge
 
* *if painting is done* arrange furniture/shelving in lounge
  
 
== Sunday Sept 27 ==
 
== Sunday Sept 27 ==
 
 
* complete anything from Saturday which is not yet finished
 
* complete anything from Saturday which is not yet finished
 +
* drop off projects
  
 
== Monday Sept 28 ==
 
== Monday Sept 28 ==
 
* Complete anything from Sunday which is not finished
 
* Complete anything from Sunday which is not finished
 +
* Deadline for ordering party trays from Vincenzo's or Zehrs
  
 
== Tuesday Sept 29 ==
 
== Tuesday Sept 29 ==
 +
* Complete anything from Monday which is not finished
  
 
== Wednesday Sept 30 ==
 
== Wednesday Sept 30 ==
Line 29: Line 42:
  
 
== Thursday Oct 1 ==
 
== Thursday Oct 1 ==
 +
* pick up small bills and change for cash box
 +
* set up bar
 +
* set up food table
 +
 +
== During the Event ==
 +
* Bartenders:
  
 
= Advertising =
 
= Advertising =

Latest revision as of 16:45, 25 September 2009


Contents

Time Line

Not Scheduled Yet

  • paint door & towel rack with glossy black enamel (Ben)
  • install lattice in work room (Mark & Caelyn)
  • purchase liquor
  • arrange catering (Natalie, Cedric)


Thursday Sept 24

  • Sand & prime the Lounge (Michael)
  • take fridge to curb
  • take any other garbage or recycling to curb
  • posters need to be put up all around town

Friday Sept 25

  • Paint the Lounge -- 2 coats (Michael)
  • posters need to be put up all around town

Saturday Sept 26

  • Two Hands Project visits
  • tiling the kitchen (Gus, Cheryl?)
  • replace glass window panes (Gus)
  • paint window frames (Steph)
  • *if painting is done* arrange furniture/shelving in lounge

Sunday Sept 27

  • complete anything from Saturday which is not yet finished
  • drop off projects

Monday Sept 28

  • Complete anything from Sunday which is not finished
  • Deadline for ordering party trays from Vincenzo's or Zehrs

Tuesday Sept 29

  • Complete anything from Monday which is not finished

Wednesday Sept 30

  • final clean-up and prep (Steph, Ben, Bevan, Darin, Michael)

Thursday Oct 1

  • pick up small bills and change for cash box
  • set up bar
  • set up food table

During the Event

  • Bartenders:

Advertising

  • Posters need to be posted around town

Space Prep

Front Door & Signage

  • front door needs to be painted with glossy black enamel paint (Ben has paint and has volunteered to do the door)

Lounge

  • shelving needs to be re-arranged to open the space back up
  • remove anything we're not keeping
  • wash the floors. again.
  • project displays
  • kwartzlab info displays?
  • garbage bin

Work Room

  • wash the floors. again.
  • tables for food/beverage service
  • garbage bin

Kitchen

  • floor needs to be tiled
  • garbage bin

Bathroom

  • bathroom needs to be cleaned right before the party
  • towel rack hung, and fresh towel(s) in place
  • check hand soap & toilet paper

Food & Drink

  • need a cash box (Eric/Alex should have) with small bills/change

Catering

  • order food, soft drinks
  • plates, cutlery, napkins, cups

Booze

  • liquor license is in hand
  • need to order & pick up liquor -- how much?

Bartending

Presentations

  • President's closing remarks/toast
Personal tools
Navigation