2013 Move
From Kwartzlab
Our goal is to have the space ready for a February 1st grand opening!
Contents |
Timetable for Moving
- Decide which walls to be knocked down. Has a plan been decided on?
- Start knocking down walls Dec. 23
- Build wall for laser room
- set up shelving
- mid-January: move laser
- move bins
Major Projects
There are various projects that need someone to head them up. If you can volunteer for them (lead or otherwise), please drop your name in the project list.
Signage
Lead: Doug
Volunteers:
- Require a new sign for the back of the building (currently unlit, looking for solutions)
- Require a new sign for the front of the building
Computer Cabling
Lead: Ben
Volunteers:
- Remove existing network cabling in the building
- Setup rack/patch panel in central location
- Run drops for downstairs work area, tool area and upstairs
- New switches, router and wireless AP (Ben has the equipment)
Electrical
Lead:
Volunteers:
- Assess current electrical drops from front and rear panels
- Run cabling for larger machines, various drops along walls (and ceiling?)
- Run cabling for upstairs outlets (would also require a 220v for stove, if Kitchen is going upstairs)
Plumbing
Lead:
Volunteers:
- Work on bathroom, check existing plumbing & drainage
- Sink in the clean area would be a plus
- Upstairs sink (If kitchen goes there)
Flooring
Lead:
Volunteers:
- Upstairs floor needs the most work. Requires sanding/painting at the very least. We may want to cover the existing floor with plywood and paint/put down laminate instead.
- Downstairs floor just needs the carpet ripped up to expose the concrete. The floor is already painted at some spots, perhaps we could look at a non-skid coating, etc.
Walls
Lead:
Volunteers:
- Knocking out existing walls (GUS SMASH)
- Building new walls per our layout
- Repair existing drywall
- Painting!
Dust Collection
Lead:
Volunteers:
- Figure out location for our already-purchased dust collector
- Work with electrical team for 220v drop
- Plan venting in regards to machine locations